  1. The Luddy Hardware Database is updated daily and is considered the central resource for the most up to date information about IT assets. See the Hardware Database Guidelines for input information.
  2. Each June the IT Director will download a report from the IT-28 Compliance reports within the Luddy Hardware Database. This report is uploaded into the IU Ready tool. This file contains information that is above and beyond the minimal required information in the IU Ready system.
  3. The IT Director will lead the Core Infrastructure Team in a review of the IT section of the IU Ready tool and revise and update accordingly.
  4. The IT Disaster Recovery policy and plan will be updated concurrently.